Goal Post Dock Door Protection

SKU: HWS-G-GPDDP Category:

Overhead and Dock Door Protection

Tired of costly door repairs? Goal Post System is designed to protect your overhead doors from expensive repairs. Our Goal Post System, made of 6” steel posts and 4” schedule 40 steel pipe cross bar, arrive in three sections for quick installation. No welding, sanding or painting required. Just slot together and draw out the set bolts, hoist and set in place. This is a perfect door guarding solution for distribution centers, clean rooms, and cold storage facilities. Like all of guardrail system products, our HDPE plastic covers eliminate the need to paint!

Easy Installation

  • Ships in three quick-to-install pieces
  • No field welding required

Maintenance Free

  • Schedule 40 steel sleeved in durable plastic to eliminate the need to paint
  • Eliminate costly door repair and replacement

The Advantage

  • Custom heights available
  • No maintenance required
  • Long lasting protection

Made Of:

Pipe post: 6″ diameter, schedule 40 pipe
Pipe rails: 4″ schedule 40 pipe

Sleeved In:

High-Density Thermoplastic Polyethylene (HDPE) with ultra-violet and anti-static additives

Standard Heights:

8′,10′, 12′, 14′, 16′
Custom configurations available

Standard Widths:

8′,10′, 12′, 14′, 16′
Custom configurations available

Installation Options:

Minimum 24″ core depth recommended for coring installation (less than a 24” core requires an approved sign off is required)
Base plate: 3/4″ x 12″ x 12″  (an approved sign off is required)

Reviews

There are no reviews yet.

Be the first to review “Goal Post Dock Door Protection”